2022 Valid RCDDv14 Exam Updates – 2022 Study Guide [Q85-Q105]

Rate this post

2022 Valid RCDDv14 Exam Updates – 2022 Study Guide

RCDDv14 Certification – The Ultimate Guide [Updated 2022]

BICSI RCDDv14 Exam Syllabus Topics:

Topic Details
Topic 1
  • Review ICT close-out documentation with the owner to ensure it is accurate and complete
Topic 2
  • Assess ICT current conditions as required to determine design solutions by conducting a site survey and reviewing record documentation
Topic 3
  • Produce ICT close-out documentation for the owner to provide the record documentation of the installation
Topic 4
  • Calculate (size) ICT premise backbone pathways to ensure standards and code compliance and
  • or client requirements are met
Topic 5
  • Calculate (size) ICT horizontal pathways to ensure standards and code compliance and
  • or client requirements are met
Topic 6
  • Design ICT telecommunication spaces to ensure standards compliance and
  • or client requirements are met
Topic 7
  • Participate in additional bid
  • tender activities (i.e., bidders’ conference, meetings, site walks) as required
Topic 8
  • Participate in the procurement of ICT materials to ensure the materials match the submittals
  • Define scope of ICT Design
Topic 9
  • Perform field engineering
  • observations to clarify and provide direction to the installer as to where issues exist
Topic 10
  • Produce ICT Bill of Materials
  • List of Materials (BOM
  • LOM) for the project stakeholders
Topic 11
  • Conduct final ICT inspections to ensure standard and code compliance, design intent, and
  • or client requirements are met

 

Q85. During the last steering committee meeting, a program manager presented the benefits register to the program governance board. Since the intended benefits of the program were realized the program manager was asked to transition the program into operations.
At this stage, what is expected during the post-review session organized by the program manager?

 
 
 
 

Q86. Which of the following serves as a guiding principle for a program manager when preparing a program work breakdown structure?

 
 
 
 

Q87. When considering pathway types, the ICT distribution designer should consider the applicable MICE factors as defined in TIA 568 for structured cabling systems and components MICE 3 relates to

 
 
 
 

Q88. A component protect of a multiyear program delivers all expected products and services as anticipated. The component project manager obtains approvals from the stakeholders and transitions the benefits to operations What should the program manager do next?

 
 
 
 

Q89. You are designing a multi-story dwelling and need to place the CTR’s. Every floor is not available. What is the alternate spacing for the CTRs?

 
 
 
 
 

Q90. Which of the following is a consideration for lighting telecommunication spaces?

 
 
 
 

Q91. A large program consists of several component projects and six project managers. The program governance board requests that all components within the program undergo user acceptance testing before being released to the production environment Where should the program manager document this?

 
 
 
 

Q92. A key stakeholder’s requirement contradicts the organization’s strategic objectives. The program manager meets with the stakeholder but is unable to reach a compromise on the requirement What should the program manager do first?

 
 
 
 

Q93. Using a vertical cable support structure can create issues for the cable attached to the pathway Several issues can result It the support work is not clone correctly. Which two of the following conditions could be caused by a poorly supported cabled (Select two options.)

 
 
 
 
 

Q94. A company’s marketing department Tails an internal compliance audit To comply with the auditor’s remediation plan the legal department mandates that a content management system (CMS) be implemented After initiating the program for CMS implementation the program manager discovers that the marketing department has already preselected which CMS technology will be implemented.
What should the program manager do to ensure the success of the program?

 
 
 
 

Q95. In order for an ICT distribution designer to identify the BEST solutions for the client’s needs they may have to provide

 
 
 
 

Q96. A telephone facility and an electrical facility are required in a tunnel. To reduce the effects of EMI and eliminate the need for additional shielding of the cables, where would each facility be placed?

 
 
 
 
 

Q97. Which of the following transmitter light sources has a MINIMUM bandwidth of 4700 MHz/km (EMB) at 850 nm”>

 
 
 
 

Q98. During the design phase, drawings for ICT communications spaces should be reviewed for Standards compliance and

 
 
 

Q99. The program manager compiles a program performance report for review by the program governance board.
The performance report indicates that the scope, quality and schedule objectives have been me, but costs and resource utilization are higher than expected The program can no longer deliver the planned return-on-investment within an acceptable level and the intended benefits have not yet been realized After further analysis of the performance indicators the program manager should do which of the following*?

 
 
 
 

Q100. Before working on equipment, what is the FINAL step in the lockout/tagout (LOTO) procedure?

 
 
 
 
 

Q101. Which of the following two items are examples of items associated with a submittal? (Select two options.)

 
 
 
 
 

Q102. An ICT distribution designer is preparing a price quote for a building design with multiple floors originally sized at 40.000 ft (3716 m2). While the designer is preparing the quote, the structural engineer indicates the building has been increased in size to accommodate an additional 40,000 ft2 (3716 m3) per floor. The designer’s recommendation to the engineer will be to increase the slot area by_____for each additional 40,000 ft3 (3716 m2)

 
 
 
 

Q103. The project manager of project A develops a communications management plan. The project manager of project B is new and is uncertain how to develop appropriate communications for the company’s staff What should the program manager do to ensure communications on the component projects are consistent?

 
 
 
 

Q104. Exhibit:

A pay telephone using coins needs to be installed in a public area. In the specifications, it is required that the telephone shall meet the ADA (Americans with Disability Act) requirement for side reach using a wheelchair.
What will be the maximum reachable height or the value of “X”?

 
 
 
 
 

Q105. The MINIMUM required for backbone floor to floor pathways is five (5) sleeves each being 103 mm (four trade size) in diameter What increase in usable floor space should another 103 mm (four trade size) sleeve be added?

 
 
 
 

RCDDv14 Practice Exam and Study Guides – Verified By TestKingFree: https://www.testkingfree.com/BICSI/RCDDv14-practice-exam-dumps.html

         

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below