[Q14-Q35] Real HPE6-A66 dumps – Real HP dumps PDF in here [Dec-2022]

Rate this post

Real HPE6-A66 dumps – Real HP dumps PDF in here [Dec-2022]

Realistic TestKingFree HPE6-A66 Dumps PDF – 100% Passing Guarantee

NO.14 A network architect is designing a new wired and wireless solution for for a company. The company has two buildings on a campus, which each building has three floors. The campus core will be placed in the basement of Building 1. Each wiring closet has eight strands of multi-mode OM3 grade fiber that connect to a wiring closet of the first floor of the building it is contained, referred to as a main distribution frame (MDF). The maximum distance between a floor’s wiring closet and the MDF is 100 feet (30 meters). The maximum distance between the two MDFs and the campus core is no more than 150 feet (45 meters). There are eight strands of multi-mode OM3 grade fiber from these two MDF closets to the campus core.
Based on this information, which type of design should be used and what is the maximum speeds supported all uplinks for the existing the multi-mode fiber?

 
 
 
 

NO.15 A customer placed an order for an ArubaOS 5406R switch and plans to rack mount it in a wiring closet. The dimensions of the switch are 17.5 inches wide (44.45 cm), 6.9 inches high (17.5 cm), and 17.75 inches deep (45.1 cm). How many rack units should a customer plan for this switch?

 
 
 
 

NO.16 A network architect is designing a wireless solution for a company that is leasing one floor in a multi-floor building in a downtown area. The customer is concerned about ensuring complete Wi-Fi coverage and pin-pointing RF hazards. What type of survey should the network architect perform?

 
 
 
 

NO.17 NewStellar has a main corporate campus in a business park with two adjacent buildings. Each building has three floors and each floor is 322 x 175 feet (98 x 53 meters) for 56,350 square feet (5,235 square meters) total. The ceiling for each floor is 12 feet (3.6 meters) high with a drop-down ceiling at 10 feet (3 meters). The network architect has given you one floor to analyze, Building 1 Floor 2, shown in the attached exhibit.

This floor has a central main corridor with washrooms, stairs, elevators and supply and network cabinets. There are cubicles around the perimeter of the floor. The central part main corridor’s dimensions contain 9,350 square feet (870 square meters). Assuming that wireless coverage is not required in the central area, which square footage (square meter) value should a network architect use when determining the number of APs in a capacity design for each floor?

 
 
 
 

NO.18 A network architect is creating a new wired design for a warehouse building. As a best practice, what length should the architect allow for the service loop in the wiring closets in this environment?

 
 
 
 

NO.19 A network architect is creating a new wireless solution for a customer. Wireless coverage is required throughout all four floors of two buildings on the same campus. Dynamic RF capabilities, including AirMatch, are required. Seamless roaming is required within and between the two buildings. Each floor will have approximately 20 APs and 6 external APs are required for connectivity between the two buildings.

 
 
 
 

NO.20 A network architect is designing a new Wi-Fi solution for a customer The customer currently occupies a one-story building on a small campus. In one part of the building there is an auditorium, where the ceiling height and attenuation is different from the rest of the building. What should the network architect create in VisualRF to identify this difference when planning :ne APs?

 
 
 
 

NO.21 A customer is purchasing Aruba 555 APs for a new wireless network. The APs will be pre-staged as campus APs (CAPs) and be managed by a controller solution During the pre-staging process, console access to the APs might be necessary Which console connection cable should the customer purchase for the 555 APs?

 
 
 
 

NO.22 A network architect is designing a Wi-Fi solution for a customer using Aruba Central’s VisualRF tool When creating a Campus view, how would the network architect pull in a map that displayed the campus location in a city?

 
 
 
 

NO.23 A network architect has created two sites in IRIS and defined network devices for each site. From which window would a network architect connect the two sites together?

 
 
 
 

NO.24 A high-end theater venue will be implementing an Aruba wireless solution using ceiling- and wall-mounted APs. The venue wants to ensure the the APs blend into the ceiling and wall environments. What solution should the customer use to ensure that wireless coverage is not hampered?

 
 
 
 

NO.25 Which type of Aruba AP uses its radio as its back-haul connection?

 
 
 
 

NO.26 A customer requires a campus core virtualization solution that supports a dual control and management planes, as well as active-active forwarding paths. Which solution would meet the customer’s requirements?

 
 
 
 

NO.27 A network architect is given the task to design a new network solution for NewStellar Company, Inc. NewSteiiar has a main corporate campus in a business park with two adjacent buildings. The network architect has given one floor to analyze, Building 1 Floor 2, shown in the attached exhibit.

Each building has three floors and each floor is 322 x 175 feet (98 x 53 meters) for 56,350 square feet (5,235 square meters) total, which results in a total of 338,100 feet (31,410 square meters) for the entire building space. Each floor has a central main corridor with washrooms, stairs, elevators and supply and network cabinets. There are cubicles around the perimeter of the floor. The central part main corridor’s dimensions contain 9,350 square feet {870 square meters).
Because of security concerns, video cameras will be installed throughout the facility. There are 16 of these per floor, 8 per wiring closet. The cameras are non-WiFi capable and require POE 802.3af-capable switch ports from which to draw power.
A wireless capacity design is required. Assuming that wireless coverage is required across the Building 1, Floor 2, including the central area, and that half the required APs will connect to each wiring closet, approximately how many POE+ ports will be required per wiring closet for all devices that have POE or POE+ needs?

 
 
 
 

NO.28 A network architect needs to design a new wireless solution for a small company The architect estimates that about 150 APs will be required to implement a capacity design. Roaming support is required. Also, the design requires meshing to connect some of the APs to the network.
The customer requires that client state synchronization be provided for real-time failover.
Which solution would most cost-effectively meet these requirements?

 
 
 
 

NO.29 A network architect plans to implement channel bonding in a new wireless design that involves dense deployment of APs. Which channel width would be optimal for this design?

 
 
 
 

NO.30 A customer has some employees that travel to various locations, where these employees will need Wi-Fi access at these locations. Because many of these locations do not have wireless support, the employees will need to carry an AP solution with them. Internet connectivity, if it doesn’t exist at these locations, will be provided by a national phone company USB wireless card which will be connected to AP. The wireless solution needs minimal bandwidth, but needs to minimally support 802.1 lac wave 1 devices.
Which Aruba AP wireless solution would meet the needs of these employees most effectively and cost efficiently?

 
 
 
 

NO.31 When determining a customer’s agenda and clarifying their expectations for a new HPE/Aruba deployment, which two questions should be asked during the stakeholder checklist? (Select two.)

 
 
 
 
 

NO.32 A network architect needs to plan a new wireless network

 
 
 
 

NO.33 A company has hired a network architect to replace an existing legacy wireless and wired network The building is one-story and contains four wiring closets Based on the information the network architect gathered from the company, one 48-port POE+ switch and three 48-port non-POE+ switches will be placed in each wiring closet. One stacking domain should be created for each wiring closet that supports 40 Gbps uplinks.
Which stacking solution should the architect implement for the floor that meets the requirements and is the most cost-effective’?

 
 
 
 

NO.34 A customer has a need to track traffic patterns and anomalies on a pair of ArubaOS-CX 8400 series switches. Which technology will the customer need to deploy for these switches?

 
 
 
 

NO.35 A company has two buildings on a campus that are approximately 700 feet (214 meters) apart with a clear line of site. No fiber exists between the buildings; however, there is a need for connecting the networks in the buildings together. The connection between the two buildings will need to support peak rates over 1 Gbps.
Which solution should the company choose that will meet their requirements as well as being cost-effective?

 
 
 
 

Verified HPE6-A66 dumps Q&As Latest HPE6-A66 Download: https://www.testkingfree.com/HP/HPE6-A66-practice-exam-dumps.html

         

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below